30kW PV System

United Mitre10 – Albion Park, NSW

Prior to having the 30kW system installed by SunPeople, the management team at United Mitre10 had looked into solar several times. They had been put off by interstate companies quoting the installation without any local presence. SunPeople were able to provide; expert design, high quality materials, competitive pricing and local support … a winning combination.

Project Details

PV System

30kW

Panels

Trina 330W x 90

Inverter

Fronius Symo 15kW x 2

Mounting

Clenergy

Challenges
The large, readily accessible roof space with modern steel construction provided the perfect blank canvas for the SunPeople design and install teams. There were 2 key obstacles to overcome; the skylight roof sheets posed a safety risk, as they could not hold the weight of a person, and there was no obvious way to get the solar panels onto the roof.
Outcomes
The installation was completed in 1 week by our expert installers. To overcome the skylight issue, timber walkways and safety bollards were installed to ensure there was safe access at all times. Material access was managed by hiring a crane to quickly and safely lift the panels and mounting system onto the roof.

Quick Commercial Quote

  • Interested? Fill out the form below and we'll be in touch with you soon.
  • Your Details
  • How much was your last power bill?
  • This field is for validation purposes and should be left unchanged.

© 2017-2024 SunPeople Ltd. Designed by Studio Friday. Developed by Circular Creative.
Illustrations by Kiara Mucci ©. Photographs by Justin Barton Photography.