Commercial
7-Storey Office Building
Wollongong CBD, NSW
Project overview
SunPeople was engaged to design, supply and install a 99kW PV system on a high-rise commercial rooftop in Wollongong CBD. The project's primary objective was to install enough PV capacity to offset the building's air-conditioning costs.
challenge
Limited roof space made it difficult to fit the required capacity, calling for a combination of high-powered panels and an optimised inverter system to reach the full 99kW. The building's prominent, high-traffic CBD location added further design complications.
outcome
SunPeople completed the installation within the six-week timeframe, with minimal disruption to the building's tenants and their strict operating requirements. The 99kW system has continued to outperform its original production estimates.
Specifications
System size
99kW
Solar panels
273 × Trina 365W
Inverter
3 × SolarEdge 27kW
Mounting
Schletter Klip-Lok
Location
Wollongong CBD, NSW
Type
Commercial
SAVINGS
TBA