7-Storey Office Building

Wollongong CBD, NSW

Project overview

SunPeople was engaged to design, supply and install a 99kW PV system on a high-rise commercial rooftop in Wollongong CBD. The project's primary objective was to install enough PV capacity to offset the building's air-conditioning costs.

challenge

Limited roof space made it difficult to fit the required capacity, calling for a combination of high-powered panels and an optimised inverter system to reach the full 99kW. The building's prominent, high-traffic CBD location added further design complications.

outcome

SunPeople completed the installation within the six-week timeframe, with minimal disruption to the building's tenants and their strict operating requirements. The 99kW system has continued to outperform its original production estimates.

Specifications

System size

99kW

Solar panels

273 × Trina 365W

Inverter

3 × SolarEdge 27kW

Mounting

Schletter Klip-Lok

Location

Wollongong CBD, NSW

Type

Commercial

SAVINGS

TBA